Well, there was no paddling for us today. My better half was napping as the launch time came and went for the SSAK trip near Shelton.
It was a chilly day, felt like a good day to work on a boat. We decided to try out the new Lowe's, nothing special just a brand new store. The parking lot was a solid sheet of ice. I did pick up a nice 4x4 green cedar post for a couple of paddles, I check the big box stores every now and then to see what's in the pile. Not bad two paddles for $21.00.
I was looking for wood for the gunnels of two new boats, so off to homey depot. I got 3 1x6x12' peices of pine, I am going for light weight boats this time. One hour to rip and glue up the gunnels for two boats.
Power planer does a nice job of cutting the scarf joints for the gunnels. Each step is 9" back, keep cutting till it is a long flat plane. Glue up with Gorilla glue.
Next came the marking out of the deck beams and the ribs. I'm going for a play/surf boat, gunnel's are 14' 7.5" 22" wide, I had to add a extended to the middle brace from the last boat.
